The may day bank holiday weekend and we spent the saturday at the garage. The door
sills weakness was a concern and so Ross and his dad constructed some
bars to push down inside the damaged areas to give support. Welding two L sections
together formed a square bar, and then plates were welded on the ends which could
then be welded onto the body at the front.
My dad came to help too and he and I armed with drills with wire brushes attacked
the gunk some more to clean up more of the important areas that we were going to
patch up. An angle grinder was also used to take out some of the sills that were
rusted beyond repair. We'll have to come up with a way to patch these cleanly as
they're exterior, but the gaps will allow us to weld our new struts on along their
length.
The day was a productive one, but it's becoming obvious that a lot of time needs
to be spent on the body before we can think about new parts.